Missed bins? Help is on its way. Cleanaway are experiencing delays to bin collections. If your bin is missed, Cleanaway will return the following day to complete the collection. Please leave your bin out at the kerb until it has been emptied. If your bin has not been collected within 24 hours of your usual collection day, you can log a missed collection or call the waste line on 1800 777 844. More information is available here.

Dismiss alert

Building services

Are you building in the City of PAE? Find out how to lodge your application, and learn about essential safety provisions and building compliance.

Are you planning to build in the City of PAE?

South Australia’s planning, building and development system changed in March 2021, since which time all development applications must be lodged through PlanSA.

You’ll need to lodge a development application for any activity that’s defined as development under the PDI Act 2016.

The PlanSA website will help you to determine whether you need approval. It will also guide you through the process of lodging an application. All development applications for building rules consent are assessed against the National Construction Code. The building drawings are assessed by the relevant authority (either the council or a Private Building Certifier). Applicants must submit all relevant building documentation to the relevant authority via the PlanSA portal.

Our Building Services officers undertake mandatory building inspections during different stages of construction, to ensure that buildings are constructed to a satisfactory standard for compliance and safety purposes.

Essential safety provisions

Essential Safety Provisions (ESPs) are a standard part of owning a commercial or multi-unit residential building. They are critical for the safety of the property and its occupants. ESPs are fire safety items that prevent the spread of fire and allow for effective evacuation in the event of an emergency. They include fire extinguishers, non-flammable linings and exit doors.

ESP requirements for a building are set when development approval is granted as follows:

  • Form 1: Schedule of ESPs to be installed in the building, specifying installation and maintenance standards
  • Form 2: To be completed by the installer of each item (such as the builder), then returned to council
  • Form 3: If applicable to the building, must be completed and returned to council annually

Failing to comply with ESP requirements is an offence in South Australia. The following fines apply:

  • Failing to provide a Form 3 within 60 business days after the end of the calendar year: $750
  • Failing to maintain ESPs: $750
  • Failing to produce proof of maintenance when requested to: $500

Refer to previous development approval documents if you have them, or ask us for a list of ESPs.

Under the Planning, Development and Infrastructure Regulations 2017, the responsibility and liability of building fire safety ultimately falls on the property owner.

While owners might have agreements with tenants or builders about who will carry out the installation or maintenance of fire equipment, the owner is ultimately legislatively responsible. This means that if enforcement action is required (for example, a fine) it will be against the property owner.

A Form 3 is a document that needs to be returned to council within 60 business days after the end of each calendar year, and it certifyies that all required ESPs have been tested and maintained for the previous year. The Form 3 lists all applicable ESPs and their relevant maintenance standards.

Form 3s are only required for high-risk buildings, such as:

  • Class 2 buildings
  • Class 3, 4, 5, 6, 7, 8, or 9b buildings which are 4+ storeys or 500sqm+
  • Class 9a or 9c buildings of any size

Form 3s are also required when:

  • The relevant authority has requested a Form 3 due to there being a performance solution
  • The building has been subject to a fire safety defect notice

Owners of buildings that are not required to provide a Form 3 to council annually must still maintain their ESPs.

As of March 2021, Form 3s must be in the prescribed format. The Form 3 must be signed by both the maintenance contractor and the building owner/manager. The maintenance contractor may list any defects outstanding at the time of submission.

If several different parties are performing the routine maintenance of the ESPs in a building, each party must submit a Form 3 for their part of the work. This may include a fire technician, mechanical contractor, lift contractor, electrician or the building owner/tenant if they are performing some of the maintenance themselves.

Note: We provide building owners with Form 3s already pre-filled with the information specific to their building (including the list of required ESPs in Table 3.1). We can also provide an electronic copy for completion by maintenance contractors upon request.

To complete a Form 3:

  1. Confirm that the reference information on the first page is correct
  2. The person performing the maintenance fills Table 3.1 with the ESPs they are maintaining. Alternatively, if it has already been filled out by council with all ESPs applicable to the building, the person performing the maintenance strikes out any that they are not responsible for
  3. The person performing the maintenance selects an option in the ‘maintenance verification’ box on the first page. Any outstanding defects should be listed in Table 3.2
  4. The person performing the maintenance signs the contractor section on the first page and lists their licence number, where required. If no licence is required, the competency/qualification section should be completed. Note: maintenance work being performed by someone who does not hold the required licence invalidates the Form 3
  5. The property owner/manager confirms that all ESPs have been covered, and takes note of any outstanding defects requiring rectification
  6. The property owner/manager signs the owner’s verification and submits the form to us

Form 3s must be returned to us within 60 business days after the end of the calendar year. If a property owner is unable to return their Form 3(s) to us within 60 business days after the end of the calendar year, they must obtain an extension of time from us to avoid a fine or other enforcement action.

Under the Planning, Development and Infrastructure Regulations 2017, the onus is on the property owner to remember to return their Form 3 annually. While we have previously provided annual reminders at no cost to the property owner, we cannot guarantee that this service will be provided indefinitely.

A schedule of ESPs is attached to a building forever (vacant or otherwise) until it’s either demolished or replaced by a new one. We therefore strongly recommend that property owners retain this information and set themselves an annual reminder.

Put simply, a property owner must comply with the development approval for their building, which includes having all ESPs installed per the approved plans and Form 1. The ESPs required for a building can only be determined via the development assessment process.

If some ESPs are found to be missing from a building, they will need to be installed in accordance with the approved plans as soon as possible, or an amendment to the original development approval sought to remove that requirement (if permissible under the National Construction Code). Any proposed changes to the approved schedule of ESPs must be formalised before we can accept a different Form 3.

A property owner may also at any time seek to have the ESPs reissued entirely for their building if there are substantial variations, or if they wish to upgrade the maintenance standards.

Most ESPs can be inspected by a fire technician. We recommend that property owners search online or in the yellow pages for ‘fire testing and maintenance’. Note that some ESPs require the technician to hold a specific licence to be able to perform the routine maintenance (hydrants, hose reels and sprinklers).

Some ESPs may also be maintained by other people including:

  • Lift technicians
  • Mechanical/air conditioning technicians
  • Electricians
  • Builders/surveyors/architects
  • Property owners/tenants

We recognise that ESPs can be complex at times, and our dedicated ESP officer and experienced Building Team are always available to assist with any queries. The safety of the community is of the utmost importance to us, however, and we may become concerned if the owners of a property fail to install or maintain ESPs as required. ESPs are not simply red tape – they are a critical (and effective) means of ensuring the safety of a building, its occupants and fire fighters.

We will always provide the owner with the opportunity to rectify the deficiency first. However, if they don't do so, we may eventually determine that the only remaining course of action is to expiate and/or commence legal action against the property owner. We may then seek to either revoke the Certificate of Occupancy for the building (meaning it may not be occupied anymore) or refer the matter to the Council Building Fire Safety Committee.

Failure to meet ESP obligations can void insurance and open owners up to serious legal issues if there is a fire.

Building and development compliance

Our Development Compliance Officers regularly investigate alleged breaches of the Planning, Development, and Infrastructure Act 2016 (the ‘Act’). Breaches may include:

  • Development without authorisation
  • Breach of conditions of an authorisation
  • Unauthorised change of land use

Where a breach of the Act poses a risk to public health and safety or to the environment or where it significantly detracts from the amenity of an area, we’ll take reasonable and proportionate enforcement action against those who act unlawfully.

If you want to report a breach of the Act, give us a call on 8405 6600 or email service@cityofpae.sa.gov.au.